Hari | Jam | Ruang | |||||||
315 | 407 | 524 | 525 | 527 | 523 | MASJID | |||
Senin | 1 | 07.00 - 07.50 |
STRUKTUR BETON PRATEGANG DAN PRACETAK 3 SKS 6-A |
STRUKTUR BANGUNAN 2 SKS 2-A |
KALKULUS II 3 SKS 2-E |
ANALISA STRUKTUR METODE MATRIK 3 SKS 4-B |
PERENCANAAN PERKERASAN JALAN 3 SKS 6-B |
MEKANIKA TANAH II 2 SKS 4-A |
|
2 | 07.50 - 08.40 | ||||||||
3 | 08.40 - 09.30 |
STRUKTUR BANGUNAN 2 SKS 2-B |
ILMU UKUR TANAH 3 SKS 2-D |
||||||
4 | 09.30 - 10.20 |
REKAYASA GEMPA 2 SKS 6-C |
KALKULUS II 3 SKS 2-A |
AS RANGKA BATANG 2 SKS 2-C |
PERENCANAAN PERKERASAN JALAN 3 SKS 6-A |
||||
5 | 10.20 - 11.10 |
MANAJEMEN KONSTRUKSI 3 SKS 6-D |
|||||||
6 | 12.10 - 13.00 |
MEKANIKA FLUIDA & HIDROSTATIKA 3 SKS 2-B |
AS RANGKA BATANG 2 SKS 2-E |
STRUK. BETON BERTULANG 4 SKS 4-B |
|||||
7 | 13.00 - 13.50 |
STATISTIK DAN PROBABILITAS 3 SKS 2-D |
|||||||
8 | 13.50 - 14.40 |
WIRAUSAHA 2 SKS 8-C |
LAPANGAN TERBANG 2 SKS 6-C |
STRUK. BETON BERTULANG 4 SKS 4-A |
|||||
9 | 15.15 - 16.05 | ||||||||
10 | 16.05 - 16.55 |
WIRAUSAHA 2 SKS 8-D |
TEKNIK IRIGASI 2 SKS 4-D |
PENGELOLAAN SAMPAH 2 SKS 8-AP |
STRUK. BETON BERTULANG 4 SKS 4-E |
||||
11 | 16.55 - 17.45 | ||||||||
12 | 18.15 - 19.05 |
MATEMATIKA TERAPAN 3 SKS 4-A |
ASPEK HUKUM PEMBANGUNAN 2 SKS 6-A |
TEKNIK IRIGASI 2 SKS 4-C |
APLIKASI KOMPUTER 2 SKS 6-B |
MANAJEMEN TRANSPORTASI 2 SKS 8-AP |
MEKANIKA BAHAN 2 SKS 2-A |
||
13 | 19.05 - 19.55 | ||||||||
14 | 19.55 - 20.45 |
Hari | Jam | Ruang | |||||||
315 | 407 | 524 | 525 | 527 | 523 | MASJID | |||
Selasa | 1 | 07.00 - 07.50 |
STRUKTUR BETON PRATEGANG DAN PRACETAK 3 SKS 6-B |
STRUKTUR BANGUNAN 2 SKS 2-C |
MANAJEMEN KONSTRUKSI 3 SKS 6-C |
ANALISA STRUKTUR METODE MATRIK 3 SKS 4-C |
ANGKUTAN MASSAL 2 SKS 4-E |
MEKANIKA TANAH II 2 SKS 4-B |
|
2 | 07.50 - 08.40 | ||||||||
3 | 08.40 - 09.30 |
STRUKTUR BANGUNAN 2 SKS 2-D |
ANGKUTAN MASSAL 2 SKS 4-D |
ILMU UKUR TANAH 3 SKS 2-E |
|||||
4 | 09.30 - 10.20 |
REKAYASA GEMPA 2 SKS 6-D |
KALKULUS II 3 SKS 2-C |
STRUKTUR PELAT CANGKANG 2 SKS 8-AP |
|||||
5 | 10.20 - 11.10 |
ANGKUTAN MASSAL 2 SKS 4-C |
|||||||
6 | 12.10 - 13.00 |
MEKANIKA FLUIDA & HIDROSTATIKA 3 SKS 2-D |
STRUK. BETON BERTULANG 4 SKS 4-D |
||||||
7 | 13.00 - 13.50 |
REK. LALU LINTAS 2 SKS 4-A |
WIRAUSAHA 2 SKS 8-A |
STATISTIK DAN PROBABILITAS 3 SKS 2-C |
|||||
8 | 13.50 - 14.40 |
AS RANGKA BATANG 2 SKS 2-B |
STRUK. BETON BERTULANG 4 SKS 4-C |
||||||
9 | 15.15 - 16.05 |
REK. LALU LINTAS 2 SKS 4-B |
WIRAUSAHA 2 SKS 8-B |
||||||
10 | 16.05 - 16.55 |
MEKANIKA BAHAN 2 SKS 2-C |
AS RANGKA BATANG 2 SKS 2-F |
PENGELOLAAN SAMPAH 2 SKS 8-BP |
|||||
11 | 16.55 - 17.45 | ||||||||
12 | 18.15 - 19.05 |
MATEMATIKA TERAPAN 3 SKS 4-B |
ASPEK HUKUM PEMBANGUNAN 2 SKS 6-B |
APLIKASI KOMPUTER 2 SKS 6-C |
EKONOMI TRANSPORTASI 2 SKS 8-AP |
||||
13 | 19.05 - 19.55 | ||||||||
14 | 19.55 - 20.45 |
Hari | Jam | Ruang | |||||||
315 | 407 | 524 | 525 | 527 | 523 | MASJID | |||
Rabu | 1 | 07.00 - 07.50 |
STRUKTUR BETON PRATEGANG DAN PRACETAK 3 SKS 6-C |
MANAJEMEN KONSTRUKSI 3 SKS 6-B |
DRAINASE PERKOTAAN 2 SKS 8-AP |
ANALISA STRUKTUR METODE MATRIK 3 SKS 4-A |
PERENCANAAN PERKERASAN JALAN 3 SKS 6-D |
MEKANIKA TANAH II 2 SKS 4-D |
AIK II |
2 | 07.50 - 08.40 | ||||||||
3 | 08.40 - 09.30 |
ILMU UKUR TANAH 3 SKS 2-C |
STRUK. BETON BERTULANG 4 SKS 4-B |
||||||
4 | 09.30 - 10.20 |
BHS. INGGRIS II READING 2 SKS 2-D TIM LC |
AS RANGKA BATANG 2 SKS 2-A |
KALKULUS II 3 SKS 2-B |
|||||
5 | 10.20 - 11.10 |
STRUK. BETON BERTULANG 4 SKS 4-A |
AIK IV | ||||||
6 | 12.10 - 13.00 |
BHS. INGGRIS II LISTENING 2 SKS 2-E TIM LC |
ILMU UKUR TANAH 3 SKS 2-A |
AS RANGKA BATANG 2 SKS 2-D |
|||||
7 | 13.00 - 13.50 |
STATISTIK DAN PROBABILITAS 3 SKS 2-B |
PERENCANAAN PERKERASAN JALAN 3 SKS 6-F |
STRUK. BETON BERTULANG 4 SKS 4-E |
|||||
8 | 13.50 - 14.40 |
BHS. INGGRIS II SPEAKING 2 SKS 2-E TIM LC |
REKAYASA LALU LINTAS 2 SKS 4-D |
||||||
9 | 15.15 - 16.05 |
MEKANIKA FLUIDA & HIDROSTATIKA 3 SKS 2-A |
|||||||
10 | 16.05 - 16.55 |
BHS. INGGRIS II READING 2 SKS 2-B TIM LC |
BHS. INGGRIS II SPEAKING 2 SKS 2-C TIM LC |
REK. LALU LINTAS 2 SKS 4-C |
BHS. INGGRIS II LISTENING 2 SKS 2-D TIM LC |
||||
11 | 16.55 - 17.45 | ||||||||
12 | 18.15 - 19.05 |
MATEMATIKA TERAPAN 3 SKS 4-C |
ASPEK HUKUM PEMBANGUNAN 2 SKS 6-C |
APLIKASI KOMPUTER 2 SKS 6-A |
BHS. INGGRIS II LISTENING 2 SKS 2-A TIM LC |
BHS. INGGRIS II READING 2 SKS 2-C TIM LC |
BHS. INGGRIS II LISTENING 2 SKS 2-B TIM LC |
||
13 | 19.05 - 19.55 | ||||||||
14 | 19.55 - 20.45 |
Hari | Jam | Ruang | |||||||
315 | 407 | 524 | 525 | 527 | 523 | MASJID | |||
Kamis | 1 | 07.00 - 07.50 |
STRUKTUR BETON PRATEGANG DAN PRACETAK 3 SKS 6-D |
BHS. INGGRIS II SPEAKING 2 SKS 2-B TIM LC |
TEKNIK PONDASI LANJUT 2 SKS 8-AP |
ANALISA STRUKTUR METODE MATRIK 3 SKS 4-D |
MEKANIKA TANAH II 2 SKS 4-C |
PERENCANAAN PERKERASAN JALAN 3 SKS 6-C |
|
2 | 07.50 - 08.40 | ||||||||
3 | 08.40 - 09.30 |
ILMU UKUR TANAH 3 SKS 2-B |
STATISTIK DAN PROBABILITAS 3 SKS 2-A |
||||||
4 | 09.30 - 10.20 |
MEKANIKA FLUIDA & HIDROSTATIKA 3 SKS 2-C |
TEKNIK IRIGASI 2 SKS 4-A |
PERENCANAAN PERKERASAN JALAN 3 SKS 6-E |
|||||
5 | 10.20 - 11.10 | ||||||||
6 | 12.10 - 13.00 |
TEKNIK IRIGASI 2 SKS 4-B |
STATISTIK DAN PROBABILITAS 3 SKS 2-E |
||||||
7 | 13.00 - 13.50 |
MANAJEMEN KONSTRUKSI 3 SKS 6-E |
|||||||
8 | 13.50 - 14.40 |
MEKANIKA BAHAN 2 SKS 2-D |
BHS. INGGRIS II LISTENING 2 SKS 2-C TIM LC |
ANGKUTAN MASSAL 2 SKS 4-A |
|||||
9 | 15.15 - 16.05 | ||||||||
10 | 16.05 - 16.55 |
REKAYASA GEMPA 2 SKS 6-E |
BHS. INGGRIS II SPEAKING 2 SKS 2-D TIM LC |
ANGKUTAN MASSAL 2 SKS 4-B |
|||||
11 | 16.55 - 17.45 | ||||||||
12 | 18.15 - 19.05 |
MATEMATIKA TERAPAN 3 SKS 4-D |
AIR TANAH 2 SKS 8-AP |
BHS. INGGRIS II READING 2 SKS 2-E TIM LC |
APLIKASI KOMPUTER 2 SKS 6-D |
||||
13 | 19.05 - 19.55 | ||||||||
14 | 19.55 - 20.45 |
Hari | Jam | Ruang | |||||||
315 | 407 | 524 | 525 | 527 | 523 | MASJID | |||
Jum'at | 1 | 07.00 - 07.50 |
LAPANGAN TERBANG 2 SKS 6-B |
STRUKTUR BANGUNAN 2 SKS 2-E |
REKAYASA GEMPA 2 SKS 6-A |
STRUK. BETON BERTULANG 4 SKS 4-C |
|||
2 | 07.50 - 08.40 | ||||||||
3 | 08.40 - 09.30 |
LAPANGAN TERBANG 2 SKS 6-A |
STRUKTUR BANGUNAN 2 SKS 2-F |
REKAYASA GEMPA 2 SKS 6-B |
STRUK. BETON BERTULANG 4 SKS 4-D |
||||
4 | 09.30 - 10.20 | ||||||||
5 | 10.20 - 11.10 | ||||||||
6 | 12.10 - 13.00 | ||||||||
7 | 13.00 - 13.50 |
STRUKTUR BETON PRATEGANG DAN PRACETAK 3 SKS 6-E |
KALKULUS II 3 SKS 2-D |
MEKANIKA FLUIDA & HIDROSTATIKA 3 SKS 2-E |
MANAJEMEN KONSTRUKSI 3 SKS 6-A |
||||
8 | 13.50 - 14.40 | ||||||||
9 | 15.15 - 16.05 | ||||||||
10 | 16.05 - 16.55 |
BHS. INGGRIS II READING 2 SKS 2-A TIM LC |
MEKANIKA BAHAN 2 SKS 2-E |
MEKANIKA TANAH II 2 SKS 4-E |
|||||
11 | 16.55 - 17.45 | ||||||||
12 | 18.15 - 19.05 |
BHS. INGGRIS II SPEAKING 2 SKS 2-A TIM LC |
MEKANIKA BAHAN 2 SKS 2-B |
APLIKASI KOMPUTER 2 SKS 6-E |
|||||
13 | 19.05 - 19.55 | ||||||||
14 | 19.55 - 20.45 |